The other half of a decommission: what happens to the IT

Two vendors, one elevator, one deadline, and no shared schedule. The IT half of a decommission is where most move-out timelines actually break.

Decommissioning
In short

The IT half of a decommission has a different chain of custody from the furniture half and should be scoped separately. Data-bearing devices need documented wiping or destruction with certificates, network and AV gear has resale value that is usually ignored, and cabling and racks are the items most often left for the general contractor to bin. Decide who owns the IT scope before the move-out, because in the gap it becomes nobody's.

A decommission has two inventories. There is the furniture, which is heavy, visible, and worth money. And there is everything with a serial number on it: monitors, docks, displays, AV, network gear, the server closet nobody has opened since the last IT lead left.

These get handled by two different vendors, hired by two different departments, on two different schedules, sharing one freight elevator. That is where move-out timelines break. Not because either vendor is bad at their job, but because nobody owned the sequence between them.

Why the two jobs collide

A sequence that holds

  1. One inventory, two columns Walk the floor once and record both. Furniture by zone, IT by serial. Two separate walkthroughs produce two documents that disagree, and the disagreement surfaces on the last week.
  2. Data-bearing first, always Anything that stores data leaves the building under a documented chain of custody before general clearance starts. This is the one step that cannot be compressed later.
  3. Detach before you demount Arms, docks, cable management, and screens come off the furniture as their own pass. Skipping it means damaged worksurfaces and a lower grade on the resale, which is a real cost, not a cosmetic one.
  4. Share one elevator calendar One booking, one schedule, both vendors on it. Whoever is coordinating the move owns this, and it should be written down rather than assumed.
  5. Route displays and AV carefully Large-format displays, room systems, and conference AV are the category most often thrown out and most often worth something. They fall between the two vendors, which is exactly why they get skipped.
  6. Collect both sets of paperwork Certificates of destruction on the IT side, diversion weights and donation receipts on the furniture side. Your reporting needs both and they are only collectible while the job is running.

What we do and what we do not

To be direct about scope: we handle the furniture. Task seating, systems, storage, conference, and lounge, from inventory through resale, donation, and recycling, with the documentation attached. We do not wipe drives and we do not issue certificates of destruction.

What we do is sequence against whoever does. On a coordinated project the IT vendor takes the first window, we take the zones behind them, and neither crew waits on the other. That coordination is unglamorous and it is most of what keeps a move-out on schedule.

The categories that fall between the vendors

ItemWhere it usually goesWhere it should go
Monitor armsLandfill with the deskResale. High demand, small, easy to move
Large-format displaysE-wasteResale or donation if functional
Conference room AVAbandoned in placeAssessed. Room systems hold value
Power and data whipsCut and scrappedKept with the system they belong to
Sit-stand controllersBinned as e-wasteKept with the base. Without them the desk is a table
Personal lockers and pedestalsOverlooked entirelyResale. Every hybrid office is short on both

That last column is worth a real conversation before the crews arrive. Sit-stand controllers separated from their bases is the single most expensive small mistake we see on Bay Area move-outs, and it is covered in buying used sit-stand desks.

2vendors, one elevator, one deadline
1inventory document, not two
24-48hrresponse across the Bay Area

Planning a move-out with both halves in play? Start with the decommission intake and tell us who is handling the IT. We will schedule around them. The full sequence is in the Bay Area decommissioning checklist.

Questions we get asked

No. We handle furniture, and we coordinate our schedule with whoever is handling your IT so the two crews are not competing for the same freight window. Data-bearing equipment needs a specialist with certificates of destruction, and that is a different vendor.

Data-bearing IT equipment leaves first, under documented chain of custody. Detaching arms, docks, and screens from the furniture is the pass in between, and general furniture clearance follows behind it zone by zone.

Yes, and they are thrown out constantly. They are small, in demand, and easy to move, which makes them one of the better recovery items on a floor. Detach them as their own pass rather than letting them leave attached to a desk.

Assess it rather than abandoning it. Functional room systems and large-format displays have resale or donation value, and they are the category most likely to fall between an IT vendor and a furniture vendor and get left behind.